TRI/Environmental (TRI) is a leading,
accredited geosynthetic, plastic pipe, and
erosion and sediment control product testing
laboratory. TRI’s large-scale testing
facility in the upstate of South Carolina at
the Denver Downs Research Farm (DDRF)
currently focuses on erosion and sediment
control testing and expands on our
industry-leading index and bench-scale
erosion and sediment control testing
capabilities. DDRF is a 300+ acre research
farm affording plentiful access to various
sloping terrain and water from four ponds.
Additionally, DDRF has numerous unused
structures which are available to house
covered research and testing and for
material and equipment storage. Earthmoving
equipment is also readily available. DDRF is
located just a mile off Interstate 85 about
25 miles southeast of Greenville, in
Anderson County, SC. A large selection of
hotels and restaurants are available within
1 mile of the site. The facility began
operating in the third quarter of 2006.
ASTM D 6459 Determination of Rolled
Erosion Control Product (RECP) Performance
in Protecting Hillslopes from
Rainfall-Induced Erosion. This is
full-scale simulated rainfall on 3:1 slopes
with bare and RECP-protected soil,
including:
-
Rainfall
Intensities = 50, 100, 150 mm/hr @ 20
minutes each;
-
1
control + 3 replicate slopes;
-
Inclined
(3:1) slopes, 40-ft long and 8-ft wide;
-
18-inch
compacted soil veneer;
-
Simulated rain system with 14-ft drop
height & up to 6+ inches/hr capacity.
ASTM D 6460 Determination of Rolled
Erosion Control Product (RECP) Performance
in Protecting Earthen Channels from
Stormwater-Induced Erosion. This is
full-scale channel flow with RECP-protected
soil, including:
-
Increasing Shear Levels psf @ 30 minutes
each;
-
3
replicate test sections;
-
Rectangular (flume) or Trapezoidal
cross-section with 5 and 10% slope;
-
Rectangular cross-section has 2-ft width
and 2-ft high side walls;
-
Trapezoidal cross-section has 2-ft
bottom and 2H:1V side-slopes;
-
12-inch
compacted soil veneer;
-
80-ft
total length;
-
Flow
capacity up to 30cfs for 30 minutes =
54000 ft3 = 13,500 gpm.
ASTM D 7208: Determination of Temporary
Ditch Check Performance in Protecting
Earthen Channels from Stormwater-Induced
Erosion. This is full-scale channel
flow (3 cfs) in a trapezoidal channel with
check structure(s) installed.
ASTM D 7351: Determination of Sediment
Retention Device Effectiveness in Sheet Flow
Applications. This is full-scale
sediment retention device (SRD) exposure to
sediment laden runoff equivalent to a 100-ft
long slope and a 4” rainfall.
Contact
Facility Manager
with inquiries:
Joel Sprague
864/242-2220
jsprague@tri-env.com
|
|
|
|
|

Test Slopes Prepared for Application of Erosion Control
Protection Material

Test Slopes Ready for Testing after Application of Erosion
Control Protection Material

Trapezoidal Channel Being Formed for Testing

Rectangular Flume Ready for Testing

Flow Introduced Into Rectangular Flume

Full-scale Sediment Control Testing
|